AcreX buys or leases New Jersey land to build battery storage.

Power on standby for your town.

A battery site stores power when demand is low and releases it at peak times. Your town gains tax revenue, with no new students and almost no traffic.

AcreX Buys or Leases NJ Land for Battery Storage

Why every town needs one

The grid is running short.

A battery site adds backup power close to home, on a small lot.

6,831 MW

Short of the regional grid's reliability target in its latest auction.

2,000 MW

New Jersey's storage goal for 2030, set by state law.

¼ acre

Enough land for a typical 5 MW site.

How it works

A reservoir for electricity.

It fills when power is plentiful and releases it when everyone needs it.

The grid

Charges it when demand is low.

Battery site

Holds the power.

Homes and businesses

Get it back at peak times.

For municipalities, planning boards, and public agencies

What your town gets.
And what it doesn't.

Your town gets

  • Reliable power

    Backup for the busiest hours.

  • New tax revenue

    Property taxes or an agreed payment.

  • Safe by design

    Built to New Jersey's latest fire code.

  • Small footprint

    Ground-mounted on industrial or commercial land or brownfields.

Your town doesn't get

  • No impact to schools

    No homes, so no new students and no added school costs.

  • Almost no traffic

    No on-site staff. Monitored remotely 24/7.

  • No water or sewer demand

    No restrooms. Any fire-water needs are set with the fire official.

  • No loud noise

    Must meet the state's nighttime noise limit.

Town land welcome

Milltown approved a 15-year battery lease on borough land.

Ready for your board

Fire, noise, and flood plans, before the hearing.

Request a municipal briefing

Notes Reliability: PJM's 2028/29 capacity auction (Base Residual Auction) cleared at its $325/MW-day price cap and 6,831 MW short of the reliability requirement2; P.L.2018, c.17 sets the 2,000 MW storage goal1. Tax: under N.J.A.C. 18:12-10.2, land and improvements are taxable unless an exemption or a payment in lieu of taxes (PILOT) applies1617; industry analysis notes storage can bring property taxes, PILOTs, and community-benefit agreements12. Fire: the 2024 International Fire Code, adopted into the NJ Uniform Construction Code, requires NFPA 855; we design to UL 9540A test data910. Noise: N.J.A.C. 7:29 limits commercial and industrial noise at a residential property line to 65 dBA by day and 50 dBA at night11. Monitoring: utility-scale platforms run 24/7 remote monitoring15. Footprint: NYSERDA says 5 MW systems can typically fit in a quarter-acre lot, including 10-foot fire-code clearance6. Milltown Ordinance 25-157078.

See it in 3D

See how small it is.

Drag to explore. Slide from 5 to 20 MW.

Open full screen

Notes Illustration only, not a design for a real site. Unit sizes come from manufacturer datasheets45. The 5 MW, 2-hour view shows 4 units: 3 required by the datasheet ratings plus 1 spare.

For landowners

Lease or sell your land for battery storage

Own industrial or commercial land near power lines? We may buy or lease it, then build and run the battery.

Lease or sell

Your choice. We handle the rest.

Small lots work

Often about a quarter acre.

PSE&G area preferred

Our focus, not a hard limit.

No posted prices. We share terms after a quick screening.

Submit your landI'm a broker

Notes Footprint: NYSERDA6. Option and lease lengths are typical industry terms, not an offer19.

The process

Four simple steps.

  1. 1

    Check

    Grid, zoning, flooding, and neighbors.

  2. 2

    Secure

    An option to buy or lease.

  3. 3

    Approve

    The utility, grid operator, and town review it.

  4. 4

    Build

    We build it and run it.

Notes Approvals: a PSE&G distribution interconnection application, a PJM wholesale-market path, and local site-plan review with the fire official involved early. PJM designed its reformed interconnection Cycle as a one- to two-year review18. Remote 24/7 monitoring15.

New Jersey law · P.L.2026, c.84

New Jersey law now allows it on the right land.

Path 1

10 or more connected acres

Industrial or commercial property of 10 or more contiguous acres with one owner. The whole property counts, not just the pad.

Path 2

Any size, every town

Brownfields, landfills, contaminated sites, and mining or closed resource extraction sites.

Elsewhere, local zoning applies. Site plan and safety reviews still apply. A lawyer confirms each site. This is not legal advice.

Read the full guide

Notes P.L.2026, c.84 (S3183), approved September 9, 2026, effective immediately, amends N.J.S.A. 40:55D-66.11 (parcel or parcels of 10 or more contiguous acres owned by the same person or entity, in industrial or commercial districts) and 40:55D-66.16 (permitted use in every municipality on the listed site types)202122. Battery storage is not an "inherently beneficial use"; S689 is still in committee131423.

Questions

Plain answers.

What is a battery storage site?

A large battery connected to the power grid. It stores electricity when demand is low and sends it back when demand peaks.45

Why does my town need one?

The regional grid fell 6,831 megawatts short of its reliability target in its latest capacity auction, and state law calls for 2,000 megawatts of storage by 2030. A battery site adds backup close to home, on a small lot, and pays property taxes or an agreed amount.211617

Is it safe?

It's built to New Jersey's current fire code, which requires the NFPA 855 battery-safety standard, and to the equipment's fire-test results. We meet the fire official before we apply and offer firefighter training. No facility is risk-free, so there is a written design and a response plan.910

Is it loud? Will it bring traffic?

It must stay under New Jersey's nighttime limit of 50 decibels (dBA) at the nearest home. After construction, no one works on site. It's monitored remotely 24/7.1115

Does the town get tax revenue?

Yes. New Jersey taxes land and what's built on it, unless an exemption or a payment in lieu of taxes (PILOT) is agreed. We work out the right fit with the town. We won't post a made-up dollar amount.1617

Does it affect schools?

No. There are no homes, so no new students and no school costs.

How much land does it need?

A 5 MW battery's equipment takes a few hundred square feet. With safety spacing, a compact site is about a quarter acre. Larger setbacks or nearby homes can mean half an acre to an acre.456

Is battery storage allowed under New Jersey zoning?

It depends on the land. Under P.L.2026, c.84, approved September 9, 2026, battery storage is a permitted use in industrial and commercial districts when the parcel or parcels total 10 or more contiguous acres owned by the same person or entity. The test is the land, not the equipment pad, so a compact 5 to 10 MW system on a commonly owned 10-plus-acre industrial or commercial tract can qualify. Storage on a brownfield, landfill, contaminated site, or mining or closed resource extraction site is a permitted use in every municipality, with no acreage minimum. Battery storage is not an "inherently beneficial use"; a bill to change that (S689) has not passed. Everywhere else, local zoning applies. A lawyer confirms whether a site qualifies. This is not legal advice.20212223

Can a town lease its own land for this?

Where the law allows, yes. We lease or buy municipal, county, authority, and school-district land, and we answer RFPs. Milltown approved a 15-year lease of borough land for a battery project. This is not legal advice.78

Do you buy land or lease it?

Either. Deals usually start with an option (often 18 to 24 months) while we study the site, then a purchase or a long-term lease (often 20 to 25 years). These are typical industry terms, not an offer. We share terms after a screening.19

Is AcreX part of the state's storage program?

The Board of Public Utilities runs the Garden State Energy Storage Program toward the 2,000-megawatt goal, and its rules change over time. We don't claim an award, or that any current program pays for a 5 MW project like ours.13

I represent a town or agency. How do we start?

Request a briefing below or email Jon@AcreX.co. We'll cover siting, fire safety, and what a complete application needs. We won't file in your town without a site and a process.

Get in touch

Let's talk.

Request a municipal briefing

For mayors, councils, planning boards, and public agencies.

Requests go to Jon@AcreX.co. We will not file anything in your town unless we have a site and you have a process.

Submit your land

For landowners and brokers.

I am a *

Have a tax map, survey or photos? Email them to Jon@AcreX.co after you submit.

By submitting, you confirm the information is accurate to the best of your knowledge. Brokers protected.

Thank you.

We will review it and reply.