Lease or sell
Your choice. We handle the rest.
Power on standby for your town.
A battery site stores power when demand is low and releases it at peak times. Your town gains tax revenue, with no new students and almost no traffic.
Why every town needs one
A battery site adds backup power close to home, on a small lot.
Short of the regional grid's reliability target in its latest auction.
New Jersey's storage goal for 2030, set by state law.
Enough land for a typical 5 MW site.
How it works
It fills when power is plentiful and releases it when everyone needs it.
Charges it when demand is low.
Holds the power.
Get it back at peak times.
For municipalities, planning boards, and public agencies
Your town gets
Backup for the busiest hours.
Property taxes or an agreed payment.
Built to New Jersey's latest fire code.
Ground-mounted on industrial or commercial land or brownfields.
Your town doesn't get
No homes, so no new students and no added school costs.
No on-site staff. Monitored remotely 24/7.
No restrooms. Any fire-water needs are set with the fire official.
Must meet the state's nighttime noise limit.
Milltown approved a 15-year battery lease on borough land.
Fire, noise, and flood plans, before the hearing.
Notes Reliability: PJM's 2028/29 capacity auction (Base Residual Auction) cleared at its $325/MW-day price cap and 6,831 MW short of the reliability requirement2; P.L.2018, c.17 sets the 2,000 MW storage goal1. Tax: under N.J.A.C. 18:12-10.2, land and improvements are taxable unless an exemption or a payment in lieu of taxes (PILOT) applies1617; industry analysis notes storage can bring property taxes, PILOTs, and community-benefit agreements12. Fire: the 2024 International Fire Code, adopted into the NJ Uniform Construction Code, requires NFPA 855; we design to UL 9540A test data910. Noise: N.J.A.C. 7:29 limits commercial and industrial noise at a residential property line to 65 dBA by day and 50 dBA at night11. Monitoring: utility-scale platforms run 24/7 remote monitoring15. Footprint: NYSERDA says 5 MW systems can typically fit in a quarter-acre lot, including 10-foot fire-code clearance6. Milltown Ordinance 25-157078.
For landowners
Own industrial or commercial land near power lines? We may buy or lease it, then build and run the battery.
Your choice. We handle the rest.
Often about a quarter acre.
Our focus, not a hard limit.
No posted prices. We share terms after a quick screening.
Notes Footprint: NYSERDA6. Option and lease lengths are typical industry terms, not an offer19.
The process
Grid, zoning, flooding, and neighbors.
An option to buy or lease.
The utility, grid operator, and town review it.
We build it and run it.
Notes Approvals: a PSE&G distribution interconnection application, a PJM wholesale-market path, and local site-plan review with the fire official involved early. PJM designed its reformed interconnection Cycle as a one- to two-year review18. Remote 24/7 monitoring15.
New Jersey law · P.L.2026, c.84
Industrial or commercial property of 10 or more contiguous acres with one owner. The whole property counts, not just the pad.
Brownfields, landfills, contaminated sites, and mining or closed resource extraction sites.
Elsewhere, local zoning applies. Site plan and safety reviews still apply. A lawyer confirms each site. This is not legal advice.
Notes P.L.2026, c.84 (S3183), approved September 9, 2026, effective immediately, amends N.J.S.A. 40:55D-66.11 (parcel or parcels of 10 or more contiguous acres owned by the same person or entity, in industrial or commercial districts) and 40:55D-66.16 (permitted use in every municipality on the listed site types)202122. Battery storage is not an "inherently beneficial use"; S689 is still in committee131423.
Questions
No. There are no homes, so no new students and no school costs.
It depends on the land. Under P.L.2026, c.84, approved September 9, 2026, battery storage is a permitted use in industrial and commercial districts when the parcel or parcels total 10 or more contiguous acres owned by the same person or entity. The test is the land, not the equipment pad, so a compact 5 to 10 MW system on a commonly owned 10-plus-acre industrial or commercial tract can qualify. Storage on a brownfield, landfill, contaminated site, or mining or closed resource extraction site is a permitted use in every municipality, with no acreage minimum. Battery storage is not an "inherently beneficial use"; a bill to change that (S689) has not passed. Everywhere else, local zoning applies. A lawyer confirms whether a site qualifies. This is not legal advice.20212223
Either. Deals usually start with an option (often 18 to 24 months) while we study the site, then a purchase or a long-term lease (often 20 to 25 years). These are typical industry terms, not an offer. We share terms after a screening.19
Request a briefing below or email Jon@AcreX.co. We'll cover siting, fire safety, and what a complete application needs. We won't file in your town without a site and a process.
Get in touch
For mayors, councils, planning boards, and public agencies.
For landowners and brokers.
We will review it and reply.